Guide on How to Install Floor Tile in Perth

You might think that the floor tile work looks quite simple – quite simple that you might be willing to do it yourself. Even if you have a little experience doing this type of work, you can become something of a professional installer, or at least learn how to install floor tiles like a pro. However, if you are someone who have no experience with this type of job, then you can simply consider hiring floor tiling specialists in Perth to help you with your tiling project.

Read on to understand the process and study exactly what needs to be done to put the floor tiles that looks good.

Subfloor preparation.

If you install through the surface, you need to make sure that the surface is free from imperfections and clean from debris. Sometimes imperfections can be solved by patching with waterproof filling compounds. If you install wood, make sure the subfloor is at least 1.5 inches thick. If your subfloor is not thick, you might want to add a layer of a concrete support board to get the right floor thickness. Usually, concrete support boards coming in 1/4 “or 1/2” thick.

Put the floor

Floor tiles that look good have to be related to how the layout has been completed and how straight the lines could be. Use the lime line, take a line with a 90 degree junction in the middle of the room. Remember, sometimes, depending on the configuration of the room, this cannot be achieved, and a different approach must be followed. Follow the layout by installing loose tiles along with their spacers all the way to the walls. Start at the intersection of the chalk lines, and make a path forming a 90-degree angle with tile. If the gap between the last tile and the wall is greater than 1/2 tile, then adjust the tiles to one side or another.

Mortar mixing

Start by storing your mortar material at a temperature of between 50 to 70 degrees Fahrenheit. Mix mortar with water until the desired consistency is obtained, not too runny, not too thick. Depending on the type of mix of your mortar, you need to give time to react with the Mortar component to get the desired results. Remember that the mix should be used within 30 minutes of being mixed with the water. After you start using the mixture, don’t add water, because it will weaken and affect mixed strength. Be sure to use the correct mortar mixture when installing tile over different substrates.

Install tiles

Press the tile to mortar using a circular motion and hit with a rubber hammer so that it can adhere to mortar. Let Mortar dry for at least 24 hours and avoid stepping on the tiles. Check that lines are uniform and use tile spacers between each tile. The last line to install is the line that has tile that needed to be cut. Remove excess adhesive from tiles.